Highway bridge production line
This production line has 7 stations in total, and the distance between each station is 32m. It is suitable for the positioning, clamping and overall assembly and transportation of the 18m, 25m, and 30m bridge sections.
Process flow:
Bottom plate fixed clamping welding; 2. Bottom plate repair welding; 3. Web plate assembly; 4. Top plate assembly; 5. Automatic welding between the bottom plate and the web plate; 6.180° Flip and automatic welding between the top plate and the web plate; 7. Repair welding
Positioning principle
1. The breadboard is positioned horizontally and clamped;
2. Longitudinal positioning of breadboard;
3. The side plate is positioned and the suction cup is fixed;
4. The top plate is fixed by a vacuum suction cup;